THE PROJECT IN BRIEF:

  • Atkinson & James acting as Principal
    contractor worked alongside Project
    Managers and cost consultants
    Fitzsimons and Designers Spaceband
    to bring the Hotel owners The
    Edinburgh Collection and IHG’s vision
    to fruition.

     

  • Over a period of 6 weeks, A&J carried
    out the refurbishment of public areas,
    including reception, lounge & coffee
    bar area.

WORKS INCLUDED:

  • Strip out

  • Decoration

  • Lighting & Power

  • Bespoke Joinery

  • Flooring

  • Shopfront

CLIENT:

GARNER HOTEL

HAYMARKET EDINBURGH

PROJECT:
PUBLIC AREA
REFURBISHMENT PROGRAMME

TIME SCALE:
6 WEEK PROGRAMME 

BUDGET:
£250K

COMPLETED:
JULY 2025

THE PROJECT IN BRIEF:

  • Atkinson & James acting as Principal
    contractor worked alongside Project
    Managers and cost consultants
    Fitzsimons and Designers Spaceband
    to bring the Hotel owners The
    Edinburgh Collection and IHG’s vision
    to fruition.

     

  • Over a period of 12 weeks, A&J carried
    out the refurbishment of 195 bedrooms
    and corridors to become one of the
    first Garner by IHG Hotels in the
    country.

WORKS INCLUDED:

  • Strip out

  • Decoration

  • Lighting & Power

  • Install of Casegoods

  • Flooring

CLIENT:

GARNER HOTEL

HAYMARKET EDINBURGH

PROJECT:
BEDROOM
REFURBISHMENT PROGRAMME

TIME SCALE:
12 WEEK PROGRAMME 

BUDGET:
£1.1M

COMPLETED:
JULY 2025

THE PROJECT IN BRIEF:

  • A&J carried out refurbishment works
    to the Pool Area, Gym, Changing
    Rooms, Reception, Lounge and
    Spa Area. The project was phased
    and planned to limit the disruption
    to members and guests by keeping
    as many areas open as possible.

WORKS INCLUDED:

  • Decoration

  • Flooring

  • Refurbishment of Lockers

  • Professional cleaning of Tiles Areas

COMPLETED:

  • September 2024

CLIENT:
DELTA HOTELS, MANCHESTER AIRPORT

PROJECT:
AIRPORT LEISURE CLUB REFURBISHMENT PROGRAMME

TIME SCALE:
6 WEEK PROGRAMME 

BUDGET:
£215k

COMPLETED:
SEPTEMBER 2024

THE PROJECT IN BRIEF:
 

  • Re-branding of 149 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
     

  • Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
     

  • The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.

CLIENT:
DELTA HOTELS, PRESTON

PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME

TIME SCALE:
30 WEEK PROGRAMME 

BUDGET:
£1.7M

COMPLETED:
AUGUST 2023

THE PROJECT IN BRIEF:
 

  • Re-branding of 146 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
     

  • Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
     

  • The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.

CLIENT:
DELTA HOTELS, LIVERPOOL

PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME

TIME SCALE:
26 WEEK PROGRAMME 

BUDGET:
£1.8M

COMPLETED:
AUGUST 2023

Case Study: Delta Hotels | Worsley Park Country Club

THE PROJECT IN BRIEF:
 

  • Re-branding of 158 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
     

  • Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
     

  • The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.

CLIENT:
DELTA HOTELS, WORSLEY PARK 

PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME

TIME SCALE:
28 WEEK PROGRAMME 

BUDGET:
£1.4M

COMPLETED:
DECEMBER 2023

Atkinson & James worked alongside Project Managers and cost  consultants, www.fitzsimons.co.uk and Designer Liz McNeil of www.10-design.com to bring the Hotel owners Zetland and Hamilton Pyramid Europe’s vision to fruition.

“A destination where bright, airy event spaces create memorable backdrops for meetings, conferences and weddings”

PROJECT DETAILS:

Over a period of 4 weeks, working within an occupied hotel, the project involved the complete strip out and refurbishment of mock up bedrooms and corridor.

 

The works including flooring, lighting and power modifications, decorations, Case Goods Install, FF&E and a full bathroom installation.​

The challenge to this project was to carry out the major refurbishment works within a small area without causing any disruption to a busy hotel environment, this was achieved as always through meticulous planning and on-site communication by our highly trained operatives, resulting in the delivery of another high quality finished product for a satisfied customer.

Staverton Park Hotel & Golf Club, set in the Heart of England surrounded by stunning countryside, is a purpose-built Hotel, Golf and Conference Venue offers a wide range of facilities for both Business and Leisure travellers. 

Their PGA European-tour standard 18-hole golf course, plus many leisure facilities, make for the perfect retreat – whether relaxed or active. 

www.stavertonpark.co.uk

Please contact A&J on 0330 043 3686 for further information.

Past Case Studies:

VIEW OUR PAST CASE STUDIES:

Simply click on the thumbnails below to open the PDF's.​ Please contact A&J on 0330 043 3686 for further information.

A&J_Garner_Edinburgh_Public-1.jpg
A&J_Garner_Edinburgh_bed-1.jpg
A&J_Delta_Manchester_2025-1.jpg
A&J_Staverton_2025-1.jpg
A&J_Bristol_Royal_2025-1.jpg
A&J_Cadogan_2025-1.jpg
A&J_Danubius_2025-1.jpg
A&J_Royal_Cresent_2025-1.jpg
A&J_Park_Inn_2025-1.jpg
A&J_Holiday_Inn_2025-1.jpg
A&J_Marriott_Heathrow_2025-1.jpg
A&J_Marriott_Kensington_2025-1.jpg
A&J_Care_Homes_2025-1.jpg
A&J_Property_Response_2025-1.jpg
bottom of page