Case Study: Garner Hotel | Haymarket Edinburgh Public Area
THE PROJECT IN BRIEF:
-
Atkinson & James acting as Principal
contractor worked alongside Project
Managers and cost consultants
Fitzsimons and Designers Spaceband
to bring the Hotel owners The
Edinburgh Collection and IHG’s vision
to fruition.
-
Over a period of 6 weeks, A&J carried
out the refurbishment of public areas,
including reception, lounge & coffee
bar area.
WORKS INCLUDED:
-
Strip out
-
Decoration
-
Lighting & Power
-
Bespoke Joinery
-
Flooring
-
Shopfront
CLIENT:
GARNER HOTEL
HAYMARKET EDINBURGH
PROJECT:
PUBLIC AREA
REFURBISHMENT PROGRAMME
TIME SCALE:
6 WEEK PROGRAMME
BUDGET:
£250K
COMPLETED:
JULY 2025
Case Study: Garner Hotel | Haymarket Edinburgh Bedrooms
THE PROJECT IN BRIEF:
-
Atkinson & James acting as Principal
contractor worked alongside Project
Managers and cost consultants
Fitzsimons and Designers Spaceband
to bring the Hotel owners The
Edinburgh Collection and IHG’s vision
to fruition.
-
Over a period of 12 weeks, A&J carried
out the refurbishment of 195 bedrooms
and corridors to become one of the
first Garner by IHG Hotels in the
country.
WORKS INCLUDED:
-
Strip out
-
Decoration
-
Lighting & Power
-
Install of Casegoods
-
Flooring
CLIENT:
GARNER HOTEL
HAYMARKET EDINBURGH
PROJECT:
BEDROOM
REFURBISHMENT PROGRAMME
TIME SCALE:
12 WEEK PROGRAMME
BUDGET:
£1.1M
COMPLETED:
JULY 2025
Case Study: Delta Hotels | Manchester Airport Leisure Club Refurb
THE PROJECT IN BRIEF:
-
A&J carried out refurbishment works
to the Pool Area, Gym, Changing
Rooms, Reception, Lounge and
Spa Area. The project was phased
and planned to limit the disruption
to members and guests by keeping
as many areas open as possible.
WORKS INCLUDED:
-
Decoration
-
Flooring
-
Refurbishment of Lockers
-
Professional cleaning of Tiles Areas
COMPLETED:
-
September 2024
CLIENT:
DELTA HOTELS, MANCHESTER AIRPORT
PROJECT:
AIRPORT LEISURE CLUB REFURBISHMENT PROGRAMME
TIME SCALE:
6 WEEK PROGRAMME
BUDGET:
£215k
COMPLETED:
SEPTEMBER 2024
Case Study: Delta Hotels | Preston
THE PROJECT IN BRIEF:
-
Re-branding of 149 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
-
Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
-
The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.
CLIENT:
DELTA HOTELS, PRESTON
PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME
TIME SCALE:
30 WEEK PROGRAMME
BUDGET:
£1.7M
COMPLETED:
AUGUST 2023
Case Study: Delta Hotels | Liverpool
THE PROJECT IN BRIEF:
-
Re-branding of 146 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
-
Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
-
The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.
CLIENT:
DELTA HOTELS, LIVERPOOL
PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME
TIME SCALE:
26 WEEK PROGRAMME
BUDGET:
£1.8M
COMPLETED:
AUGUST 2023
Case Study: Delta Hotels | Worsley Park Country Club
THE PROJECT IN BRIEF:
-
Re-branding of 158 bedrooms and corridors, meeting/function rooms, bars, restaurants, gym & reception areas.
-
Works comprised of new decorations, flooring, power & lighting, plumbing, Joinery, & FF&E throughout.
-
The works were planned and executed in phases to allow the hotel to carry on trading with little or no disruption to their valued guests.
CLIENT:
DELTA HOTELS, WORSLEY PARK
PROJECT:
RE-BRAND REFURBISHMENT PROGRAMME
TIME SCALE:
28 WEEK PROGRAMME
BUDGET:
£1.4M
COMPLETED:
DECEMBER 2023
Case Study: Staverton Park Hotel & Golf Club | Daventry
Atkinson & James worked alongside Project Managers and cost consultants, www.fitzsimons.co.uk and Designer Liz McNeil of www.10-design.com to bring the Hotel owners Zetland and Hamilton Pyramid Europe’s vision to fruition.
“A destination where bright, airy event spaces create memorable backdrops for meetings, conferences and weddings”
PROJECT DETAILS:
Over a period of 4 weeks, working within an occupied hotel, the project involved the complete strip out and refurbishment of mock up bedrooms and corridor.
The works including flooring, lighting and power modifications, decorations, Case Goods Install, FF&E and a full bathroom installation.
The challenge to this project was to carry out the major refurbishment works within a small area without causing any disruption to a busy hotel environment, this was achieved as always through meticulous planning and on-site communication by our highly trained operatives, resulting in the delivery of another high quality finished product for a satisfied customer.
Staverton Park Hotel & Golf Club, set in the Heart of England surrounded by stunning countryside, is a purpose-built Hotel, Golf and Conference Venue offers a wide range of facilities for both Business and Leisure travellers.
Their PGA European-tour standard 18-hole golf course, plus many leisure facilities, make for the perfect retreat – whether relaxed or active.
Please contact A&J on 0330 043 3686 for further information.